Photovoltaic Zero Carbon Park Solution
#Carbon Free Power Plant ·2022-09-03 08:21:25
Tianchang City Urban Development Group Project Case
Project Overview and Achievements
- Location: Tianchang City, Anhui Province
- Installed Capacity: 1.6MW
- Project Status: Grid-connected and Operational
- Commissioning Date: June 2023
- Annual Carbon Reduction: Approx. 1200 tons
- Annual Average Power Generation: 1.8 million kWh
- Covered Buildings: 6 factory building roofs




Core Solutions
Photovoltaic Power Generation System
High-efficiency monocrystalline silicon modules, intelligent tracking brackets, distributed rooftop + ground power station combination, maximizing space utilization for clean energy supply
Smart Energy Storage System
Lithium battery energy storage technology, intelligent charge/discharge management, peak shaving/valley filling, emergency backup power, improving energy utilization efficiency by 30%+
Energy Management System
AI energy brain real-time monitoring, big data analysis prediction, intelligent scheduling optimization, achieving energy production-consumption dynamic balance
Multi-energy Complementary System
Integrated wind-solar-storage design combined with ground source heat pumps and biomass energy, building a multi-energy complementary zero-carbon energy network
Green Transportation Support
Solar carports + smart charging piles, park electric transportation system, achieving zero carbon emissions in transportation
Carbon Asset Management
Carbon footprint monitoring, carbon reduction certification, carbon asset development and trading, achieving dual environmental and economic benefits
Implementation Benefit Analysis